skip to main | skip to sidebar

Chronic Ride

this is blog is keep track of our summer film. it will be incredible.

Tuesday, July 31, 2007

Lobby Concept 02


EDIT: Just posted revised layout 2nd 3/4. Revised the layout based on Ken's detailed input from tonight. I've gotta wake up early tomorrow for work, so I'll see how far I can get with the other layouts in the evening tomorrow.
Posted by Jinny Liang at 5:08 PM
Labels: concept art

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Labels

  • concept art
  • concept beats
  • leica reel
  • production design
  • production research
  • research
  • templates

Blog Archive

  • ▼  2007 (59)
    • ►  September (1)
    • ►  August (13)
    • ▼  July (18)
      • Lobby Concept 02
      • Colour Scheme
      • The roughs of the other 3/4 view of the lobby. I m...
      • Lobby Concept 01
      • old lady
      • Ken's Kitchen Concepts
      • Different Colour Ideas
      • Layout by Ken / Colour by Behram
      • Kitchen and Elevator concept
      • leica reel final
      • Changes on the REEL
      • Kitchen & Bedroom Layout
      • chronic ride the second leicareel
      • style guidelines
      • Notes from Monday Meeting
      • production design sheets
      • Sam's bedroom design
      • Main Characters: Sam & Alma
    • ►  June (18)
    • ►  May (9)

Contributors

  • Jinny Liang
  • Kenneth Tam
  • LeMark
  • [B]ehram
  • concept_idea